Main building |
|
Original building before construction begins. |
|
|
|
|
|
|
|
|
|
|
Construction Begins |
|
Demolition of the lower lever begins, this is to become the new showroom. |
|
|
|
|
|
|
|
|
|
|
Workshop Building |
|
This building is currently configured as a warehouse, it is to be fitted with new vehicle lifts and equipment and have vehicle accessible ramps constructed front and rear. |
|
|
|
|
|
|
|
|
|
|
Interior Demolition |
|
Demolition through the ground floor continues. |
|
|
|
|
|
|
|
|
|
|
Interior Demolition |
|
Demolition through the ground floor continues opening the space for our new showroom. |
|
|
|
|
|
|
|
|
|
|
Interior Demolition |
|
Ceiling height raised and old stairs to be removed. |
|
|
|
|
|
|
|
|
|
|
Demolition Almost Complete |
|
The ground floor demolition is seen here almost complete, interior walls removed, only the stairs remain in the centre. |
|
|
|
|
|
|
|
|
|
|
Light Well |
|
Here you can see the new opening to allow light from above to flow down into the showroom, this will be surrounded by a new glass barrier. |
|
|
|
|
|
|
|
|
|
|
Light Well |
|
The opening for the light well from below. |
|
|
|
|
|
|
|
|
|
|
Light Well |
|
The old stair well has now been boarded over and the floor joists obscuring the new light well removed. |
|
|
|
|
|
|
|
|
|
|
Open Showroom |
|
The showroom is beginning to take shape all interior walls have now been removed, the new staircase fitted and new construction is beginning. |
|
|
|
|
|
|
|
|
|
|
Coming Soon.... |
|
New temporary signage is in place, the new official Mazda signage is on order. |
|
|
|
|
|
|
|
|
|
|
New Windows |
|
The building is slowly coming together, now looking much more like a showroom now the windows are going in. |
|
|
|
|
|
|
|
|
|
|
Showroom |
|
The showroom itself still has some way to go! |
|
|
|
|
|
|
|
|
|
|
Showroom |
|
The walls are now complete, however, plastering still has to be done along with painting and tiling of the showroom floor, floor tiles are on order |
|
|
|
|
|
|
|
|
|
|
Skylight |
|
The rail for the showroom skylight is now in place albeit currently without glass. |
|
|
|
|
|
|
|
|
|
|
Workshop |
|
The ramp for the workshop is now under construction, as the building was originally built as a warehouse it was set higher to allow vans to load and unload. |
|
|
|
|
|
|
|
|
|
|
Workshop |
|
Preparation of this building is now underway, we've now painted the floor and we're waiting for the installation of the new workshop equipment. |
|
|
|
|
|
|
|
|
|
|
Main Building |
|
Still plenty of work to be done, all the brickwork will be rendered and the new signage will be installed. |
|
|
|
|
|
|
|
|
|
|
Lighting |
|
Lighting installation is now well underway with wiring now in place and some fittings. |
|
|
|
|
|
|
|
|
|
|
Decoration |
|
The decorators have also been busy with painting both inside and out almost complete. |
|
|
|
|
|
|
|
|
|
|
Workshop Ramp |
|
As the building that will become the workshop was previously a warehouse with loading bays ramps were necessary to be abel to get cars in and out. The ramps have been constructed and filled with concrete this week. |
|
|
|
|
|
|
|
|
|
|
Showroom Floor |
|
The tiling of the showroom floor is now complete and waiting for the carpenters to return to finish the trim work. |
|
|
|
|
|
|
|
|
|
|
New Signage |
|
The new Mazda signage is now in place, including the workshop sign which is visible from the main road. |
|
|
|
|
|
|